Escalator Chain Sprocket From China Factory

Product Details
Customization: Available
Standard Or Nonstandard: Nonstandard
Application: Motor, Motorcycle, Machinery, Car
Still deciding? Get samples of US$ 9.99/Piece
Request Sample
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (28)
  • Escalator Chain Sprocket From China Factory
  • Escalator Chain Sprocket From China Factory
  • Escalator Chain Sprocket From China Factory
  • Escalator Chain Sprocket From China Factory
  • Escalator Chain Sprocket From China Factory
  • Escalator Chain Sprocket From China Factory
Find Similar Products

Basic Info.

Model NO.
Customized
Manufacturing Method
Forging Parts
Material
Carbon Steel
Teeth
9t-120t
Processing
Forging-Machining-Hobbing-Teeth Harden-Tempering
OEM
Scs Offers OEM Service
Lead Time
45 Days After Advance Payment
Heat Treatment
High Frequency Induction Hardening and Tempering
Surface Treatment
as Required
Industry Application
Cover a Wide Range of Sector Including Agriculture
Transport Package
Plywood Cases
Specification
JIS
Trademark
SCS
Origin
Changzhou, Jiangsu
HS Code
8483900090
Production Capacity
5500000 Piece/Pieces Per Year

Product Description

Escalator chain sprocket from China factory 

With more than 20 years' experience, high-precision equipment and strict management system, SCS can provide sprockets, gears, shafts, flanges and related transmission parts for you with stable quality and best service.



Escalator Chain Sprocket From China Factory










Q1: What information will be highly appreciated for a quotation?

A: It will be preferred if you can offer us the drawings, heat treatment and surface treatment requirements, required quantity, quoted currency (USD or EUR), or samples.
Q2: Are you a trading company or factory?
A: SCS is a factory located in Changzhou, Jiangsu.
Q3: What is your terms of payment?
A: T/T 50% in advance, and 50% before shipment. We'll show you the photos of the products and packages before you pay the balance.
Q4: Do you test all your goods before delivery?
A: Yes, SCS has adopted a strict quality management system and all the items will be inspected according to the inspection instruction with good inspection records.
Q5: Is there any customer that has assessed your quality management system?
A:Yes, SCS has passed the audit of many customers, such as Mitsubishi, CLAAS, Kardex and so on.
Q6: How does your company ensure the quality of the raw material?
A: The steels are purchased from our domestic well-known steel mills. After receiving the raw material, the steel will be inspected by spectrograph imported from Germany. Besides, the furnace number of steel will be well-managed in our ERP system to ensure the traceablity of our products.
Q7: How do you ensure the high quality of products?
A: With integral manufacturing processes, a strict quality control system and imported machines, we can manufacture high quality products.
Q8: What are your terms of delivery?
A: EXW, FOB Shanghai.
Q9: How about your lead time?
A: Normally it will take 45 days after receiving your advance payment. The specific lead time depends on the items and the quantity of your order.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier